Display fuel oil consumer plant

Description

If you erect or substantially modify a heating oil consumer installation that is subject to inspection, you must notify us in writing before you start erecting or substantially modifying the installation.

Heating oil consumer installations are installations for the storage and use of heating oil. Emergency power plants are to be treated like heating oil consumer plants.

The lower water authority checks whether you can construct the heating oil consumer facility as planned.

In the following cases, you do not have to submit a separate notification:

  • an official approval procedure is carried out for the heating oil consumer system
  • a determination of suitability under water law is carried out for the heating oil consumer installation
  • Fully completed notification form for heating oil consumer installations
  • Site plan (location)
  • construction drawings with location, construction type and volume of the tanks
  • building inspection certificates for tanks, safety devices and other construction products used
  • any expert reports

Fee: 49,00 - 98,00 EUR
Payment in advance: No
The plausibility check is subject to a fee according to time spent

The notification of the heating oil installation must be made 6 weeks before the start of construction.

Application Deadline: 6 Weeks
Submit the ad in writing 6 weeks in advance.

Processing Time: 4 Weeks
Processing usually takes 4 weeks.

The lower water authority of the county or city.

Many lower water authorities offer you a form for the notification. Send the completed form to the lower water authority by mail or deliver it in person.

The lower water authority checks your notification for completeness. In addition, the authority checks for compliance with the requirements of the "Ordinance on Installations for Handling Substances Hazardous to Water" (AwSV). If documents are missing, you will be requested to submit them.

As a rule, you will receive a confirmation of notification or a notice with conditions. You will also receive a fee notice for processing the notification.

Your application data will be stored at the lower water authority.

Ministry of Science, Energy, Climate Protection and Environment

The text was automatically translated based on the German content.

Authority
Untere Wasserbehörde
Breitscheidstraße 3
06886 Lutherstadt Wittenberg
Breitscheidstraße 4
06886 Lutherstadt Wittenberg
03491 806-2920
03491 806-2994
Kreisverwaltung
elevator available, wheelchair-accessible

Employee