Show operation of a heating oil system

Description

If you decide to build and operate a heating oil system,
a notification to the water authority of your county or city is required. The following should be displayed:

  • the construction of underground facilities (regardless of the storage quantity),
  • the construction of above-ground plants with more than 1 000 l of heating oil ("above ground" is also a storage in the basement of a building) and
  • all significant changes and the decommissioning of the plant
  • Fully completed display form for heating oil systems
  • for above-ground storage: Ground plan sketch of the location of the container system as well as the usually necessary drip tray with dimension
  • for underground storage: Site plan with location of the containers and route of the pipelines including dimensioning

The display of the heating oil system must be made 6 weeks before the start of construction.

Existing installations that have not yet received a permit or notification confirmation of the
Water authority, must make up the notification immediately.

The text was automatically translated based on the German content.

Authority
Untere Wasserbehörde
Breitscheidstraße 3
06886 Lutherstadt Wittenberg
Breitscheidstraße 4
06886 Lutherstadt Wittenberg
03491 806-2920
03491 806-2994
Kreisverwaltung
elevator available, wheelchair-accessible

Employee