jump link

citizen service

Where?

You enter your place of residence or the place where you want to contact the administration or use the location sensing.

What?
play_arrow
Enter words here that describe what you are looking for (e.B. cut a tree) or a matter for citizens and companies (e.B. house construction, marriage).
Source: BUS Sachsen-Anhalt (Linie6PLus)

View commissioning of low-frequency systems

Description

As an operator of a low-frequency system with a nominal voltage of 110 KV or more or a direct current system, you are obliged to notify the competent authority of this before commissioning or a significant change.

The competent authority shall examine the notification and record the installation in its plant register.

The prerequisite is that

  • the installation is located on a plot of land in the area of a development plan or within a contiguous built-up district or on a plot of land developed with residential buildings in the outdoor area or crosses such land,
  • the plant or its substantial modification does not require a permit, planning approval or other official decision that takes into account the interests of immission control.
  • Display with the data relevant for the system
  • Site plan

The notification shall be submitted to the competent authority at least two weeks before the installation is put into operation or before any significant change to the installation.

This administrative service does not constitute an administrative act. For this reason, there is no remedy.

 

Contact the State Administration Office.

The notification shall be submitted in writing by post or electronically to the competent authority.

Ministry of the Environment, Energy, Food and Forestry Rhineland-Palatinate

The text was automatically translated based on the German content.

No authority found