Show usage record
Description
If you, as the client, wish to use a structural system that is not process-free, you must report this.
Your structural facilities are not exempt from procedures if they either require a building permit or the facility is exempt from approval.
Non-procedural structural installation
- Notification of the start of use (digital or written)
- In the case of buildings of building class 4: confirmation of the construction work in accordance with the fire protection certificate. This does not apply to special constructions as well as medium-sized and large garages.
There are no costs.
You must submit this usage at least 2 weeks before use.
Lower Building Inspectorate
Form available: yes
Online procedure possible: yes
Written form required: yes
Personal appearance required: no
Check whether a notification of the start of use is necessary for your structural system.
If a notification of the start of use is necessary:
- Gather the necessary information and evidence.
- Submit the notification to the responsible lower building supervisory authority.
If you do not report the commencement of use, do not report it in time or do not provide the necessary documents, this may be an administrative offense.
In special cases, you will need the certificate of technical inspection by the building authorities.