Give advance notice of the establishment of a construction site

Description

As the client, you or your authorized third parties must give advance notice to the competent occupational health and safety authority at least two weeks before setting up the construction site if

  • the expected duration of the work is more than 30 working days and more than 20 employees are scheduled to work on the construction site over a period of at least one shift at the same time, or
  • the scope of the work is expected to exceed 500 person-days, whereby one person-day comprises the work performed by one person over one shift.

Setting up the construction site begins with the essential preparatory work at the site of the construction project that is required immediately before it is carried out, for example setting up social facilities, installing supply and disposal facilities, delivery of building materials, machinery and equipment.

You must also post the advance notice visibly and legibly on the construction site so that it is unaffected by external influences and the weather.

In the event of significant changes, you must update the posted advance notice. It is not necessary to resubmit it to the relevant health and safety authority.

Significant changes that require an adjustment to the advance notice are, for example

  • Change of client or commissioned third parties,
  • First-time appointment of a coordinating person or subsequent change of this person,
  • shortening the duration of the construction work if this means that more work has to be carried out at the same time or in unplanned shifts,
  • first-time involvement of employees from several employers or use of subcontractors,
  • a significant increase in the maximum number of simultaneous employees or the number of employers or the number of companies without employees.
  • The expected duration of the work is more than 30 working days and more than 20 employees are scheduled to work on the construction site at the same time over a period of at least one shift, or
  • the scope of the work is expected to exceed 500 person-days, with one person-day comprising the work performed by one person over one shift.
  • Advance notice
  • Transmission of the advance notice: no later than 2 weeks before the construction site is set up
  • Posting of the advance notice: at the latest when the construction site is set up
  • No legal remedy possible

Contact the State Office for Consumer Protection.

  • Forms/online services available: Yes
  • Written form required: No
  • Informal application possible: Yes
  • Personal appearance necessary: No

Check whether advance notice is required.

If advance notice is necessary:

  • Compile the necessary information.
  • Send the advance notice to the responsible health and safety authority.
  • Post the advance notice on the construction site as soon as construction site set-up begins.
  • In the event of significant changes to the content of the advance notice, check whether you need to adapt the posted advance notice and replace it immediately.

Rule of thumb: Advance notice is generally required if the construction activities require the deployment of at least 4 employees over a period of more than 6 months.

You are in breach of regulations if you deliberately or negligently fail to provide the competent authority with the necessary advance notice, or do not do so correctly, completely or in good time.
Check whether you need to prepare a health and safety plan (SiGe plan) and a document for subsequent work in addition to the advance notice for setting up a construction site.

Ministry of Social Affairs, Health and Sport Mecklenburg-Vorpommern

;

Ministry of Labor, Social Affairs, Health and Equality of the State of Saxony-Anhalt

31.08.2022;15.11.2023

The text was automatically translated based on the German content.

Authority
Landesamt für Verbraucherschutz
Freiimfelder Straße 68
06112 Halle (Saale), Stadt
Remark: The head office is located in Halle (Saale). The addresses of the individual locations can be found on the website of the State Office for Consumer Protection.
0345 52162200
0345 52162401

Monday 07:00 - 16:00

Tuesday 07:00 - 16:00

Wednesday 07:00 - 16:00

Thursday 07:00 - 16:00

Friday 07:00 - 15:30

Saturday closed

Sunday closed

10
Number:
Fees: no
Map