Apply for the construction of a sewage system
Description
Depending on the size and type of system, you may need a system permit in addition to the water discharge permit or indirect discharge permit (into the public sewer system) for the construction of a wastewater system. In this case, both permits should be applied for at the same time. Small wastewater treatment plants with an approved design generally do not require a permit.
State Administration Office
The text was automatically translated based on the German content.
39387 Oschersleben (Bode), Stadt
39331 Haldensleben, Stadt
recipients: Landkreis Börde
bank: Kreissparkasse Börde
BIC: NOLADE21HDL
IBAN: DE96810550003400005354
Frau Ivonne Rahn
- Börde:
- Apply for exemption from the permit requirement for discharging wastewater into private wastewater systems
- Apply for permission under water law for the navigation of waters with motor boats
- Apply for premature discharge of waste water into water bodies
- Apply for the construction of a sewage system
- Applying for permission for an earth excavation
- Contact Water Authority
- Display fuel oil consumer plant
- Displaying changes to a wastewater system
- Earth excavation - report unintentional groundwater development
- Earth excavation - report work with a direct or indirect impact on groundwater
- Order the cessation or removal of an earth excavation
- Show earth outcrop
- Substances hazardous to water: Specialist company - Proof of F. property
- Waste water: Operation of plants - Approval
Application for a permit in accordance with Sections 4, 5, 11 and 13 of the Water Act for the State of Saxony-Anhalt for the discharge of wastewater into groundwater / surface waters after pre-treatment in a wastewater treatment plant in accordance with DIN 4261
Download
06118 Halle (Saale)