jump link

citizen service

WHERE?

You enter your place of residence or the place where you want to contact the administration or use the location sensing.

WHAT?
play_arrow
Enter words here that describe what you are looking for (e.B. cut a tree) or a matter for citizens and companies (e.B. house construction, marriage).
Source: BUS Sachsen-Anhalt (Linie6Plus)

Repair notification Receipt

Description

As a repairer, you must affix the repairer mark to measuring instruments whose calibration period had not ended before the repair.

As a repairer, you are also obliged to inform the local verification authority immediately in writing or electronically of any repairs carried out.

A period of 7 days is regarded as immediate for the transmission of repair notifications. However, in the case of measuring devices for determining speed and distance, the repair notification must be received by the local competent verification authority within 2 working days.

If you are authorized to carry out repairs, you must inform the locally responsible verification authority immediately in writing or electronically.

Template for the repair notification

As soon as you have carried out a repair, you must inform the locally responsible verification authority immediately in writing or electronically. To do this, you can fill out the corresponding template for the repair notification.

The repair notification must be issued immediately after the repair has been carried out.

Informal application possible: No

Personal appearance necessary: No

There are no indications or special features.

§ Section 55 (3) of the Measurement and Verification Ordinance

The text was automatically translated based on the German content.

Authority
Landeseichamt
Merseburger Straße 1
06112 Halle (Saale), Stadt
Post Office Box 200 836
06009 Halle (Saale), Stadt
+49 345 21113
+49 345 2111499
Map