Display fuel oil consumer plant

Description

If you erect or substantially modify a heating oil consumer installation that is subject to inspection, you must notify us in writing before you start erecting or substantially modifying the installation.

Heating oil consumer installations are installations for the storage and use of heating oil. Emergency power plants are to be treated like heating oil consumer plants.

The lower water authority checks whether you can construct the heating oil consumer facility as planned.

In the following cases, you do not have to submit a separate notification:

  • an official approval procedure is carried out for the heating oil consumer system
  • a determination of suitability under water law is carried out for the heating oil consumer installation
  • Fully completed notification form for heating oil consumer installations
  • Site plan (location)
  • construction drawings with location, construction type and volume of the tanks
  • building inspection certificates for tanks, safety devices and other construction products used
  • any expert reports

Fee: 49,00 - 98,00 EUR
Payment in advance: no
The plausibility check is subject to a fee according to time spent

The notification of the heating oil installation must be made 6 weeks before the start of construction.

Application Deadline: 6 Weeks
Submit the ad in writing 6 weeks in advance.

Processing Time: 4 Weeks
Processing usually takes 4 weeks.

Opposition

The lower water authority of the county or city.

Many lower water authorities offer you a form for the notification. Send the completed form to the lower water authority by mail or deliver it in person.

The lower water authority checks your notification for completeness. In addition, the authority checks for compliance with the requirements of the "Ordinance on Installations for Handling Substances Hazardous to Water" (AwSV). If documents are missing, you will be requested to submit them.

As a rule, you will receive a confirmation of notification or a notice with conditions. You will also receive a fee notice for processing the notification.

Your application data will be stored at the lower water authority.

Ministry of Science, Energy, Climate Protection and Environment

The text was automatically translated based on the German content.

Authority
Untere Wasserbehörde
Post Office Box 10 02 51
06886 Lutherstadt Wittenberg
Post Office Box 10 02 51
06886 Lutherstadt Wittenberg
Breitscheidstraße 4
06886 Lutherstadt Wittenberg
03491 806-2963
03491 806-2993

Office hours of the specialist services:

Tuesday
08:30 - 12:00
13:00 - 15:00
Thursday
08:30 - 12:00
13:00 - 18:00

Information of the district of Wittenberg:

Monday
08:30 - 17:00
Tuesday
08:30 - 17:00
Wednesday
08:30 - 14:00
thursday
08:30 - 18:00
Friday
08:30 - 14:00

Kreisverwaltung
elevator available, wheelchair-accessible

Frau Jessica Gerboth

Function: Head of department
03491 806-2963
A 3-30

03491 806-2965
A 3-34
Wastewater, indirect discharges, precipitation water

Frau Kerstin Müller

Function: Clerk
03491 806-2964
A 3-39
Waste water, precipitation water

Frau Sophie Bölke

Function: Clerk
03491 806-2967
A 3-37
Geothermal energy, well drilling, groundwater extraction

Frau Kerstin Neumann

Function: Clerk
03491 806-2966
A 3-37
Groundwater abstraction, drinking water protection areas

Frau Ina Klopfer

Function: Clerk
03491 806-2922
A 3-36
Water book

Frau Silke Dolge

Function: Clerk
03491 806-2961
A 3-41
Substances hazardous to water, JGS systems

Frau Josefin Küter

Function: Clerk
03491 806-2962
A 3-41
Substances hazardous to water, plant and pipeline law

Frau Liane Besser

Function: Clerk
03491 806-2968
A 3-35
construc. Installations on bodies of water, floodplains, precipitation water

Herr Stephan Felix

Function: Clerk
03491 806-2921
A 3-35
construc. Installations on bodies of water, floodplains, precipitation water

+49 3491 806-2923
A 3-38
construc. Installations on bodies of water, floodplains, precipitation water

Frau Susann Wichert

Function: Clerk
03491 806-2969
A 3-38
construc. Installations on bodies of water, floodplains, precipitation water