View plant elimination
Description
According to § 60 Abs.3 Bauordnung des Landes Sachsen-Anhalt (BauO LSA), the removal of
- Installations according to § 60 Abs. 1 BauO LSA,
- free-standing buildings of building classes 1 and 3,
- other installations that are not buildings, with a height of up to 10 m
procedure-free.
In all other respects, the intended disposal of installations must be notified to the competent authority at least one month before the start of disposal.
- Completed official notification form
There are no fees.
Application Deadline: 1 MonthBefore starting the disposal
The responsibility lies with the district, the district-free city and the cities of Naumburg, Stendal, Köthen, Weißenfels and Zeitz.
In the case of non-detached buildings, the stability of the building or buildings to which the building to be removed is attached must be assessed by a qualified structural engineer within the meaning of § 65 (2) BauO LSA and demonstrated to the required extent; the removal shall, where necessary, be supervised by the qualified structural engineer. § 65 sec. 2 sentence 3 BauOLSA does not apply if it is attached to process-free buildings.
The text was automatically translated based on the German content.
Start your request directly online:
- Verfahrensfreie Beseitigung einer Anlage nach § 60 BauO LSA anzeigen (Languages available: de)
06886 Lutherstadt Wittenberg
06886 Lutherstadt Wittenberg
06886 Lutherstadt Wittenberg
Office hours of the specialist services:
Tuesday
08:30 - 12:00
13:00 - 15:00
Thursday
08:30 - 12:00
13:00 - 18:00
Information of the district of Wittenberg:
Monday
08:30 - 17:00
Tuesday
08:30 - 17:00
Wednesday
08:30 - 14:00
thursday
08:30 - 18:00
Friday
08:30 - 14:00
Herr Michael Dorn
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
Frau Ricarda Mählis
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination
- Wittenberg:
- Apply for a preliminary decision
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for a partial building permit for the modification of an installation
- Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the partial building permit for the change of use of a facility
- Applying for an extension of the partial building permit for the construction of an installation
- Applying for an extension of the partial building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage recording
- View plant elimination