jump link

citizen service

WHERE?

You enter your place of residence or the place where you want to contact the administration or use the location sensing.

WHAT?
play_arrow
Enter words here that describe what you are looking for (e.B. cut a tree) or a matter for citizens and companies (e.B. house construction, marriage).
Source: BUS Sachsen-Anhalt (Linie6Plus)

Earth excavation - report work with a direct or indirect impact on groundwater

Description

If you want to carry out so-called earth excavations, you must notify the competent authority.

Earth excavations are boreholes or other earthworks that reach so deep into the ground that they can affect the movement or composition of the groundwater.

Notification is required for the following projects:

  • Exploration of old mines or cavities
  • exploration of contaminated sites
  • wells
  • geochemical investigation
  • geophysical investigation
  • geothermal utilization with groundwater heat pumps
  • Drilling and pumping or absorption test
  • Groundwater measuring point
  • Engineering geological investigation or subsoil investigation
  • Mapping (except base drilling)
  • Raw material exploration drilling
  • Other exploration purposes

Once you have notified us of your planned ground exploration, you can start drilling.

Each borehole provides data for the evaluation of the subsoil at the respective location. The notification enables the responsible authorities to gain an impression of the drilling project and the drilling material produced on site. The authorities can take additional measurements and ensure the quality of the drilling results. This prevents costly mistakes in underground spatial planning.

Which water authority is responsible for your project is determined by the location of the planned drilling points.

Application Deadline: 1 Month

  • Contradiction

At a depth of less than 100 meters, the Lower Water Authority of the district or independent city is responsible. At a depth of over 100 meters, the State Office for Geology and Mining (LAGB) is responsible.

Federal Ministry for the Environment, Nature Conservation, Nuclear Safety and Consumer Protection (BMUV)

The text was automatically translated based on the German content.

Authority
Untere Wasserbehörde
Breitscheidstraße 3
06886 Lutherstadt Wittenberg
Post Office Box 10 02 51
06886 Lutherstadt Wittenberg
Breitscheidstraße 4
06886 Lutherstadt Wittenberg
03491 806-2920
03491 806-2994

Office hours of the specialist services:

Tuesday
08:30 - 12:00
13:00 - 15:00
Thursday
08:30 - 12:00
13:00 - 18:00

Information of the district of Wittenberg:

Monday
08:30 - 17:00
Tuesday
08:30 - 17:00
Wednesday
08:30 - 14:00
thursday
08:30 - 18:00
Friday
08:30 - 14:00

Kreisverwaltung
elevator available, wheelchair-accessible

Frau Jessica Gerboth

Function: Head of department
03491 806-2963
A 3-39
Waste water

03491 806-2965
A 3-34
Wastewater, indirect discharges, precipitation water

Frau Kerstin Müller

Function: Clerk
03491 806-2964
A 3-39
Waste water, precipitation water

Frau Sophie Bölke

Function: Clerk
03491 806-2967
A 3-37
Geothermal energy, well drilling, groundwater extraction

Frau Kerstin Neumann

Function: Clerk
03491 806-2966
A 3-37
Groundwater abstraction, drinking water protection areas

Frau Ina Klopfer

Function: Clerk
03491 806-2922
A 3-36
Water book

Frau Silke Dolge

Function: Clerk
03491 806-2961
A 3-41
Substances hazardous to water, JGS systems

Frau Josefin Küter

Function: Clerk
03491 806-2962
A 3-41
Substances hazardous to water, plant and pipeline law

Frau Liane Besser

Function: Clerk
03491 806-2968
A 3-35
construc. Installations on bodies of water, floodplains, precipitation water

Herr Stephan Felix

Function: Clerk
03491 806-2921
A 3-35
construc. Installations on bodies of water, floodplains, precipitation water

+49 3491 806-2923
A 3-38
construc. Installations on bodies of water, floodplains, precipitation water

Frau Susann Wichert

Function: Clerk
03491 806-2969
A 3-38
construc. Installations on bodies of water, floodplains, precipitation water