Show removal of an installation
Description
You must notify the lower building supervisory authority in advance if you wish to remove a structure.
This applies to removal that is not exempt from the procedure.
You may remove the following structures without going through the procedure:
- Installations in accordance with Section 60 (1) BauO LSA (for example: small garages, masts or walls)
- free-standing buildings of building classes 1 and 3
- as well as other installations that are not buildings with a height of up to 10 m.
You can start to remove the structure one month after you notify the building inspectorate if the building inspectorate does not take any measures.
If you only want to remove part of a building project, this is a change to a building structure. You will then need a building permit for this.
The following applies to non-detached buildings: You must have the stability of the building or the buildings to which the building to be removed is attached checked. The inspection must be carried out by a qualified structural engineer. The removal must then be monitored. This does not apply if the building is attached to buildings that are not subject to procedures.
- Notification (digital or written)
- for non-detached buildings:
- Proof of stability and
- Confirmation of stability from a qualified structural engineer
The advertisement is free of charge. There are no fees for this.
You must notify the removal at least 1 month in advance.
Lower building supervisory authority
You represent the display for removal of an installation online or in writing.
In the case of a notification in text form via the form go to you as follows:
- Fill in fill the form form.
- Add the the required documents attached.
- Submit submit the notification to the responsible lower building supervisory authority .
- The lower building supervisory authority takes the notification and the proof of the of the qualified structural engineer and checks their completeness.
- If documents are missing or there are other ambiguities, you will be you requestedto submit the missing documents or resolve the ambiguities.
- Submit submit in in this In this case, submit the missing or amended documents or the clarification.
- The lower building supervisory authority examines your notification
- If you after one month no feedback received, their their advertisement accepted and you can with the removal start.
- § Section 60 (3) Building Regulations of the State of Saxony-Anhalt (BauO LSA)
- Ordinance on building documents and notifications to building authorities (Bauvorlagenverordnung BauVorlVO)
- Administrative Regulation Technical Building Regulations (VV TB)
- Annex for Administrative Regulation Technical Building Regulations (VV TB)
Ministry of Infrastructure and Digital Affairs of the State of Saxony-Anhalt
05.06.2023
The text was automatically translated based on the German content.
Start your request directly online:
- Verfahrensfreie Beseitigung einer Anlage nach § 60 BauO LSA anzeigen (Languages available: de)
06886 Lutherstadt Wittenberg
06886 Lutherstadt Wittenberg
06886 Lutherstadt Wittenberg
Consultation hours of the specialist services:
Tue 08:30 - 12:00
13:00 - 15:00
Thu 08:30 - 12:00
13:00 - 18:00
Information of the district of Wittenberg:
Mon 08:30 - 17:00
Tue 08:30 - 17:00
Wed 08:30 - 14:00
Thu 08:30 - 18:00
Fri 08:30 - 14:00
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
Herr Michael Dorn
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
Frau Ricarda Mählis
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination
- Wittenberg:
- Apply for a partial building permit for the modification of a plant
- Apply for a preliminary decision
- Apply for an extension of the partial building permit for the change of use of a plant
- Apply for an extension of the partial building permit for the construction of a plant
- Apply for an extension of the partial building permit for the modification of a plant
- Apply for exemption in the event of a change ban to secure urban land-use planning
- Applying for a partial building permit for the construction of a system
- Applying for an extension of the building permit for the change of use of a facility
- Applying for an extension of the building permit for the construction of an installation
- Applying for an extension of the building permit for the modification of an installation
- Applying for an extension of the preliminary decision
- Applying for deviations, exemptions and exceptions from building law requirements
- Applying for deviations, exemptions and exceptions from building law requirements for building projects that do not require a procedure
- Applying for deviations, exemptions and exceptions from building law requirements for projects that do not require approval
- Applying for partial planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility
- Applying for planning permission for the change of use of a facility using the simplified procedure
- Applying for planning permission for the modification of an installation
- Applying for planning permission for the modification of an installation using the simplified procedure
- Applying for planning permission to erect a plant using the simplified procedure
- Applying for planning permission to erect a system
- Show removal of an installation
- Show start of construction
- Show usage record
- View plant elimination