Apply for the construction of a sewage system
Description
Depending on the size and type of system, you may need a system permit in addition to the water discharge permit or indirect discharge permit (into the public sewer system) for the construction of a wastewater system. In this case, both permits should be applied for at the same time. Small wastewater treatment plants with an approved design generally do not require a permit.
State Administration Office
The text was automatically translated based on the German content.
06118 Halle (Saale), Stadt
06003 Halle (Saale), Stadt
Monday - Thursday: 9:00 a.m. – 3:00 p.m.
Friday: 9:00 a.m. – 12:00 p.m.
Hint:
Appointments can also be made outside office hours by individual arrangement. Please note that individual areas have different opening hours. These can be found on the respective website of the department.