jump link

citizen service

WHERE?

You enter your place of residence or the place where you want to contact the administration or use the location sensing.

WHAT?
play_arrow
Enter words here that describe what you are looking for (e.B. cut a tree) or a matter for citizens and companies (e.B. house construction, marriage).
Source: BUS Sachsen-Anhalt (Linie6Plus)

Applying for an exemption from a change ban to secure urban land-use planning for building projects without a procedure

Description

Building projects that do not require a procedure are building projects that do not require planning permission. You may build as long as there is no change ban.

However, you can obtain an exemption from the change ban for your building project that does not require a building permit in order to safeguard the urban land-use planning if there are no overriding public interests to the contrary. The building permit authority will decide together with the municipality whether to approve your exception.

Examples of public interests:

  • Monument protection
  • nature conservation
  • environmental protection
  • Townscape and landscape

The following can be affected by a change ban:

  • Construction, modification and change of use of buildings,
  • large-scale backfilling and excavation,
  • excavations, deposits including storage sites,
  • removal of structures
  • significant or substantially value-enhancing changes to land and buildings, insofar as these are not subject to approval, consent or notification.

The change ban does not apply:

  • Projects that were approved under building law before the change ban came into force.
  • Projects of which the municipality is aware and the execution of which could have begun before the change ban came into force.
  • Maintenance work and the continuation of a previously practiced use.

For building projects

  • in formally defined redevelopment areas or
  • in urban development areas

are subject to different regulations than building projects that are affected by a change ban to safeguard urban development planning. In this case, the building project must be approved by the municipality.

There are no costs.

Period of Validity: 2 Years
Exemption is valid for 2 years and can be extended for a further 2 years.

  • Contradiction

Lower building supervisory authority

There are no indications or special features.

Federal Ministry of Housing, Urban Development and Building (BMWSB)

The text was automatically translated based on the German content.

Landkreis Wittenberg - Rechtliche Bauaufsicht (Verfügungen, Ordnungswidrigkeiten ...)
Breitscheidstraße 3
06886 Lutherstadt Wittenberg
Post Office Box 10 02 51
06886 Lutherstadt Wittenberg
Breitscheidstraße 4
06886 Lutherstadt Wittenberg
03491 806-2840
03491 806-2891

Office hours of the specialist services:

Tuesday
08:30 - 12:00
13:00 - 15:00
Thursday
08:30 - 12:00
13:00 - 18:00

Information of the district of Wittenberg:

Monday
08:30 - 17:00
Tuesday
08:30 - 17:00
Wednesday
08:30 - 14:00
thursday
08:30 - 18:00
Friday
08:30 - 14:00

Kreisverwaltung
elevator available, wheelchair-accessible

Frau Gabriele Lehnert

Function: Head of department




Further Authorities
Landkreis Wittenberg - Fachliche Bauaufsicht (Bauanträge, Vorbescheide ...)
Breitscheidstraße 3
06886 Lutherstadt Wittenberg
03491 806-2850
03491 806-2891