Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
Description
Do you operate a plant subject to immission control approval for which you already have immission control approval and plan to carry out repowering measures at this plant?
Repowering measures serve to modernize a plant for the purpose of generating electricity from renewable energies.
This repowering measure may cause adverse effects in relation to the current condition of the plant. Insofar as these are significant for the approval requirements of the plant requiring approval, a modification permit is required.
For this reason, corresponding modifications to plants requiring approval must be reviewed by the immission control authority. For this purpose, you must submit an application for a modification permit and provide all the documents required for the assessment. The application can be made in writing or electronically.
The modification permit is issued if:
- it is ensured that the obligations resulting from the requirements of the Federal Immission Control Act and the Federal Immission Control Ordinance are fulfilled, and
- other regulations under public law and occupational health and safety concerns do not conflict with the construction and operation of the plant.
A permit for wind turbines within the scope of repowering may also not be refused if, after the modernization, not all immission guide values of the technical instructions for protection against noise are complied with, but
- the immission contribution of the wind turbine after modernization is lower than the immission contribution of the wind turbines it replaces, and
- the wind turbine corresponds to the state of the art.
- Required drawings, plans, expert opinions
- explanations and
- Other documents (if necessary, ask the competent authority).
Before making the changes
- Objection
- Complaint
State Administration Office
You submit an application for a modification permit for the repowering measure to the responsible authority. You can submit the application electronically or in writing.
You enclose the documents required to assess the facts with the application.
After receipt of the application and the complete documents, the competent authority will check whether the modifications meet the requirements of immission control law. After final assessment by the competent authority, you will receive the decision in the form of an official notice.
Saxon State Ministry for Energy, Climate Protection, Environment and Agriculture (SMEKUL)
03.03.2023
The text was automatically translated based on the German content.
Start your request directly online:
- ELiA-Online (Languages available: de)
06886 Lutherstadt Wittenberg
06886 Lutherstadt Wittenberg
Office hours of the specialist services:
Tuesday
08:30 - 12:00
13:00 - 15:00
Thursday
08:30 - 12:00
13:00 - 18:00
Information of the district of Wittenberg:
Monday
08:30 - 17:00
Tuesday
08:30 - 17:00
Wednesday
08:30 - 14:00
thursday
08:30 - 18:00
Friday
08:30 - 14:00
Frau Monique Witschel
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Frau Dana Brandenburg
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Herr Ruben Göde
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Frau Claudia Melichar
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Herr René Pflug
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
06130 Halle (Saale)
06118 Halle (Saale)