Applying for partial approval for the construction of an installation
Description
If you wish to erect and/or operate a part of an installation which, due to its nature or operation, is particularly likely to cause harmful effects on the environment or otherwise endanger, significantly disadvantage or significantly inconvenience the general public or the neighborhood, you require a partial permit from the competent authority. The authority will check whether there is a legitimate interest in the construction and operation. Once the authority has completed its examination, you will receive a decision in the form of a notification.
The partial permit is granted if the fulfillment of the obligations arising from the Federal Immission Control Act for the partial project is ensured and no other public law regulations or occupational health and safety concerns conflict with this and a preliminary assessment shows that there are no insurmountable obstacles to the construction and operation of the entire plant from the outset.
- Required drawings, plans, expert opinions
- explanations and
- other documents (if necessary, ask the competent authority).
Before implementation of the project
- Objection
- Complaint
Responsibility lies with the immission control authorities of the districts and independent cities or with the State Administration Office. For matters subject to mining supervision, please contact the State Office for Geology and Mining (LAGB). You can obtain detailed information from the relevant authorities.
The approval procedure requires a written application, which must be accompanied by the drawings, plans, expert opinions and explanations as well as other documents required to check the approval requirements.
- If your application is complete, it must be published together with the documents and then displayed for one month. In simplified approval procedures or if public participation is waived, there is no public display and no discussion meeting.
- At the latest at the same time as the public announcement of the project, the licensing authority shall also request the authorities to be involved to submit their comments on the licensing requirements within one month.
- If the approval requirements are met, the authority examines whether there is a legitimate interest in the construction and operation of the sub-project.
- A preliminary assessment will determine whether there are no insurmountable obstacles to the construction and operation of the entire facility with regard to the partial approval requirements.
- You will receive notification of the approval or rejection of the partial project.
The binding effect of the provisional overall assessment does not apply if a change in the factual or legal situation or individual inspections in the context of subsequent partial approvals lead to an assessment that deviates from the provisional overall assessment, i.e. the granting of further partial approvals or the overall approval can also be refused.
Saxon State Ministry for Energy, Climate Protection, Environment and Agriculture (SMEKUL)
23.09.2022
The text was automatically translated based on the German content.
Start your request directly online:
- ELiA-Online (Languages available: de)
06886 Lutherstadt Wittenberg
06886 Lutherstadt Wittenberg
Office hours of the specialist services:
Tuesday
08:30 - 12:00
13:00 - 15:00
Thursday
08:30 - 12:00
13:00 - 18:00
Information of the district of Wittenberg:
Monday
08:30 - 17:00
Tuesday
08:30 - 17:00
Wednesday
08:30 - 14:00
thursday
08:30 - 18:00
Friday
08:30 - 14:00
Frau Monique Witschel
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Frau Dana Brandenburg
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Herr Ruben Göde
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Frau Claudia Melichar
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
Herr René Pflug
- Wittenberg (Landkreis):
- Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).
- Apply for a permit under immission control law for the construction and operation of systems
- Apply for approval in the simplified procedure for an installation in accordance with the BImSchG
- Apply for permission to operate a fixed shooting range
- Applying for a preliminary decision on an installation requiring approval
- Applying for approval for a significant change to an installation requiring approval
- Applying for approval for accident-relevant changes to an installation requiring approval
- Applying for approval for the construction and operation or modification of an installation that is relevant to an incident and does not require approval
- Applying for approval for the early construction of an installation requiring a permit
- Applying for partial approval for the construction of an installation
- Display an installation requiring approval for the first time due to a change in the law
- Display commissioning of a low-frequency system or direct current system
- Noise protection: use of work equipment between 8 p.m. and 7 a.m. - exemption permit
- Report the construction and operation or modification of an installation not requiring a permit that is relevant to a major accident
- Show modification of an installation requiring approval
- Submit a complaint about electrosmog
06130 Halle (Saale)
06118 Halle (Saale)