jump link

citizen service

Where?

You enter your place of residence or the place where you want to contact the administration or use the location sensing.

What?
play_arrow
Enter words here that describe what you are looking for (e.B. cut a tree) or a matter for citizens and companies (e.B. house construction, marriage).
Source: BUS Sachsen-Anhalt (Linie6PLus)

Show operation of a heating oil system

Description

If you decide to build and operate a heating oil system,
a notification to the water authority of your county or city is required. The following should be displayed:

  • the construction of underground facilities (regardless of the storage quantity),
  • the construction of above-ground plants with more than 1 000 l of heating oil ("above ground" is also a storage in the basement of a building) and
  • all significant changes and the decommissioning of the plant
special notes for - kreisfreie Stadt Halle (Saale), Stadt

An oil heating system is installed in a house. With the heating oil, a water-polluting substance is stored on the property. This storage must be displayed.

  • Fully completed display form for heating oil systems
  • for above-ground storage: Ground plan sketch of the location of the container system as well as the usually necessary drip tray with dimension
  • for underground storage: Site plan with location of the containers and route of the pipelines including dimensioning
special notes for kreisfreie Stadt Halle (Saale), Stadt

completed form

special notes for kreisfreie Stadt Halle (Saale), Stadt

from 26,00 EUR to 77,00 EUR

The display of the heating oil system must be made 6 weeks before the start of construction.

special notes for kreisfreie Stadt Halle (Saale), Stadt

within 4 weeks

special notes for kreisfreie Stadt Halle (Saale), Stadt

Existing installations that have not yet received a permit or notification confirmation of the
Water authority, must make up the notification immediately.

The text was automatically translated based on the German content.

special notes for kreisfreie Stadt Halle (Saale), Stadt

The text was automatically translated based on the German content.

Authority
Team Untere Wasser-/Bodenschutzbehörde
Neustädter Passage 18
06122 Halle (Saale), Stadt
+49 345 2214678
+49 345 2214667

Mon: by appointment
Tue: 09:00 a.m. - 12:00 p.m. and 01:00 p.m. - 06:00 p.m.
Wed: by appointment
Thu: 9:00 a.m. - 12:00 p.m. and 1:00 p.m. - 3:00 p.m.
Fri: by appointment
Sat: closed
Sun: closed

elevator available, wheelchair-accessible

Employee

Map