Heating oil plant

Description

If you decide to build and operate a heating oil system,
an announcement is required with the water authority of your county or county-free city. You can see:

  • the construction of underground installations (regardless of the amount of storage),
  • the construction of above-ground installations with more than 1 000 l of heating oil ("upper ground" is also storage in the basement of a building) and
  • all material changes and the decommissioning of the plant
  • fully completed display form for heating oil plants
  • for above-ground storage: Basic outline sketch of the location of the container system as well as the usually necessary collection tray with dimension
  • in the case of underground storage: Site plan with location of the containers and route of the pipelines including dimensioning

The heating oil system must be displayed 6 weeks before the start of construction.

Existing plants that have not yet received an approval or notification of the
water authority, must make up for the notification immediately.