Show removal of an installation
Description
You must notify the lower building supervisory authority in advance if you wish to remove a structure.
This applies to removal that is not exempt from the procedure.
You may remove the following structures without going through the procedure:
- Installations in accordance with Section 60 (1) BauO LSA (for example: small garages, masts or walls)
- free-standing buildings of building classes 1 and 3
- as well as other installations that are not buildings with a height of up to 10 m.
You can start to remove the structure one month after you notify the building inspectorate if the building inspectorate does not take any measures.
If you only want to remove part of a building project, this is a change to a building structure. You will then need a building permit for this.
The following applies to non-detached buildings: You must have the stability of the building or the buildings to which the building to be removed is attached checked. The inspection must be carried out by a qualified structural engineer. The removal must then be monitored. This does not apply if the building is attached to buildings that are not subject to procedures.
- Notification (digital or written)
- for non-detached buildings:
- Proof of stability and
- Confirmation of stability from a qualified structural engineer
The advertisement is free of charge. There are no fees for this.
You must notify the removal at least 1 month in advance.
Lower building supervisory authority
You represent the display for removal of an installation online or in writing.
In the case of a notification in text form via the form go to you as follows:
- Fill in fill the form form.
- Add the the required documents attached.
- Submit submit the notification to the responsible lower building supervisory authority .
- The lower building supervisory authority takes the notification and the proof of the of the qualified structural engineer and checks their completeness.
- If documents are missing or there are other ambiguities, you will be you requestedto submit the missing documents or resolve the ambiguities.
- Submit submit in in this In this case, submit the missing or amended documents or the clarification.
- The lower building supervisory authority examines your notification
- If you after one month no feedback received, their their advertisement accepted and you can with the removal start.
- § Section 60 (3) Building Regulations of the State of Saxony-Anhalt (BauO LSA)
- Ordinance on building documents and notifications to building authorities (Bauvorlagenverordnung BauVorlVO)
- Administrative Regulation Technical Building Regulations (VV TB)
- Annex for Administrative Regulation Technical Building Regulations (VV TB)
Ministry of Infrastructure and Digital Affairs of the State of Saxony-Anhalt
05.06.2023