If you want to change the use of a facility that requires a permit, you need a permit for the change of use (building permit) beforehand. You must apply for this.
Before you are allowed to change the use of a facility that requires a permit, you need a permit.
If you want to build a facility that requires a permit, then you need a building permit. For this you must submit a building application.
Before you are allowed to build a plant that requires a permit, you need a building permit.
Before you are allowed to modify a plant that requires a permit, you need a building permit.
With the partial building permit, you can start construction work to change the use of construction phases before the building permit is issued.
With the partial building permit, you can start construction work for the construction of construction phases before the building permit is issued. To do this, submit an...
With the partial building permit, you can start construction work to change construction phases before the building permit. To do this, submit an application for a partial...
If you intend to make significant changes to an installation requiring a permit, you must apply for a permit from the competent authority.
You want to operate a gas station? Then you must report this filling station to the responsible immission control authority before commissioning.
If you wish to construct and operate or modify an installation that does not require a permit and that is an operating area or part of an operating area and this may result in...
If you intend to make changes to an installation that requires a permit and generates electricity from renewable energy sources, you must apply for a permit from the relevant...
If you operate an X-ray facility in technical radiography for coarse structure analysis in materials testing, or if you want to make changes to the operation, you are obliged to...
If you want to operate a teleradiological X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.
If you want to operate a technical X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.
If you apply for a preliminary decision on a plant requiring a permit, the competent authority may grant this under certain conditions.
You can apply for the extension of your partial building permit for the change of use of facilities. Click here for more information.
You can apply for the extension of your partial building permit. Click here for more information.
You can apply for the extension of your partial building permit for the modification of installations. Click here for more information.
If you submit an application under the simplified procedure for the approval of installations, you can obtain a permit for the construction and/or operation for installations of...
If you want to manufacture devices containing radioactive substances or equipment for the production of ionizing radiation that may be operated without a permit or notification,...
In a procedure for granting a permit for facilities requiring a permit, you can submit an application to the competent authority for the early start of construction of a facility.
Your company wants to install, maintain, maintain, repair or decommission plants with fluorinated greenhouse gases, as well as check for tightness or recover the gases? Then you...
If you wish to construct and/or operate part of a new facility, you must apply for a partial permit from the appropriate authority.
The construction and operation of plants require an immission control permit if they are likely to cause particular damage to the environment or endanger the general public.
Depending on the size and type of plant, you may also need a plant permit for the construction of a wastewater plant, in addition to the water discharge permit or indirect...
Before you are allowed to modify a plant that requires a permit, you need a building permit. To do this, submit a building application to the responsible lower building...
For the approval of a cremation facility (crematorium) you need a construction and an operating permit.
If you intend to make changes to an installation requiring a permit that are relevant to an incident, you must first apply to the responsible authority for a permit.
If you have a valid building permit for the change of use of a facility, you can apply for an extension.
If you have a valid building permit for the construction of a facility, you can apply for an extension.
If you have a valid building permit for the modification of a plant, you can apply for an extension.
The competent authority shall verify compliance with chemical, physical parameters and limit values for fuels. The results are reported annually to the Federal Environment...
Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...
If you are constructing or have erected a plant requiring a permit and this installation has not yet been approved or notified, you must report this to the competent authority...
If you want to install a new or significantly change a heating oil consumer system or emergency power system, this may be subject to notification. Please find out here what you...
Before the start of the construction of an operating area or if your operating area is to be changed in a relevant manner, you must notify the competent authority in advance.
If you are planning an accident-relevant construction and operation or a modification of the installation relevant to an operation that does not require a permit and which is an...
Do you handle organic solvents in your company? Then you may have to report the system to the competent authority.
The construction and operation, the substantial modification of genetic engineering plants of safety level 1 to 4 as well as further genetic engineering work of safety levels 2...
If you intend to put an emitter into operation or make significant changes to its operation, this must be approved by the competent authority.
As part of the monitoring of industrial and commercial enterprises, the supervisory authorities may order measurements of emissions and immissions and safety-related tests by...
Do you operate a plant where fuels are stored and transferred? Then you have to report them to the authority.
Do you want to build, substantially change or shut down a liquid manure, slurry or silage leachate plant or a plant for storing solid manure or silage? Then you may have to...
If you intend to operate or significantly modify a technical X-ray facility and it does not require a permit, you are obliged to report this to the competent authority.
You must inform the competent authority that you no longer wish to operate an X-ray facility.
The results of the continuous measurements must be submitted annually to the competent authorities for review.
Exceeding the measure values for the concentration of Legionella in industrial water must be reported to the competent authority!
In the case of neighbouring operating areas, the authority checks whether domino effects exist.
If you have taken all the necessary measures during the decommissioning phase of the landfill or the landfill section, you must apply to the competent authority for the final...
Any person who establishes, operates or otherwise holds a fixed installation for the production or processing or processing of nuclear fuels or for the fission of irradiated...
For the modification of a wastewater plant, you need a plant permit in addition to the change of the water discharge permit or indirect discharge permit. Both authorisations...
If you operate a medium combustion plant, you must notify it to the competent authority.
If you wish to check, test, maintain or repair X-ray equipment or interference sources on a commercial basis, you must notify the competent authority before starting the activity.
If you want to make a change to an installation, you must notify the competent authority if a permit for the changes has not already been applied for.
As an employer, you can dispense with a recurring inspection of certain systems in potentially explosive atmospheres by developing a maintenance concept.
As an operator of a large combustion plant, gas turbine or internal combustion engine plant, you must submit measurement reports on air pollutant emissions at regular intervals...
New or updated safety reports of upper class operating areas shall be submitted to the competent authority for review.
Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...
Information, e.B. Dispersion considerations, necessary for the preparation of external emergency plans shall be submitted to the competent authority.
Upon request, specialist companies must prove the status of specialist company to the lower water authority in whose district they are active. It must also be possible to prove...
Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...
Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...
You want to run a crematorium? Then you must report the system to the responsible immission control authority before commissioning.
You want to operate a low-frequency system or a direct current system? Then you have to report them to the responsible immission control authority under certain conditions.
The commissioning of new evaporative cooling systems, cooling towers and wet separators is subject to notification, as well as changes and decommissioning of plants as well as...
According to § 60 Abs.3 Bauordnung des Landes Sachsen-Anhalt (BauO LSA), the removal of
Installations according to § 60 Abs. 1 BauO LSA,
free-standing buildings of building...
If you intend to operate or substantially modify a dental, medical or veterinary X-ray facility and it is not subject to approval, you are obliged to report this to the...
If the disposal of your plant is not procedure-free, you must report the disposal.
Depending on the size and type of plant, you may also need a plant permit for the operation of a wastewater plant, in addition to the water discharge permit or indirect...