jump link

citizen service

Where?

You enter your place of residence or the place where you want to contact the administration or use the location sensing.

What?
play_arrow
Enter words here that describe what you are looking for (e.B. cut a tree) or a matter for citizens and companies (e.B. house construction, marriage).
There are 70 services for Facilities operations and inspections

Facilities operations and inspections

Facilities often have an impact on the environment – through noise, vibrations or emissions. That is why in many cases, operations require authorisations and are subject to regular inspections. You will find information and services here.

Services:

Apply for a building permit for the change of use of a plant

If you want to change the use of a facility that requires a permit, you need a permit for the change of use (building permit) beforehand. You must apply for this.

Apply for a building permit for the change of use of a plant using the simplified procedure

Before you are allowed to change the use of a facility that requires a permit, you need a permit.

Apply for a building permit for the construction of a plant

If you want to build a facility that requires a permit, then you need a building permit. For this you must submit a building application.

Apply for a building permit for the construction of a plant using the simplified procedure

Before you are allowed to build a plant that requires a permit, you need a building permit.

Apply for a building permit for the modification of a plant using the simplified procedure

Before you are allowed to modify a plant that requires a permit, you need a building permit.

Apply for a partial building permit for the change of use of a plant

With the partial building permit, you can start construction work to change the use of construction phases before the building permit is issued.

Apply for a partial building permit for the construction of a plant

With the partial building permit, you can start construction work for the construction of construction phases before the building permit is issued. To do this, submit an...

Apply for a partial building permit for the modification of a plant

With the partial building permit, you can start construction work to change construction phases before the building permit. To do this, submit an application for a partial...

Apply for a permit for a significant modification of an installation requiring a permit

If you intend to make significant changes to an installation requiring a permit, you must apply for a permit from the competent authority.

Apply for a permit for petrol station

You want to operate a gas station? Then you must report this filling station to the responsible immission control authority before commissioning.

Apply for a permit for the construction and operation or modification of an installation that does not require a permit

If you wish to construct and operate or modify an installation that does not require a permit and that is an operating area or part of an operating area and this may result in...

Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).

If you intend to make changes to an installation that requires a permit and generates electricity from renewable energy sources, you must apply for a permit from the relevant...

Apply for a permit to operate an X-ray facility or make a significant change to the operation of materials testing

If you operate an X-ray facility in technical radiography for coarse structure analysis in materials testing, or if you want to make changes to the operation, you are obliged to...

Apply for a permit to operate an X-ray facility or make a significant change to the operation of teleradiology

If you want to operate a teleradiological X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.

Apply for a permit to operate or substantially modify the operation of a technical X-ray facility

If you want to operate a technical X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.

Apply for a preliminary decision on a plant requiring a permit

If you apply for a preliminary decision on a plant requiring a permit, the competent authority may grant this under certain conditions.

Apply for an extension of the partial building permit for the change of use of a plant

You can apply for the extension of your partial building permit for the change of use of facilities. Click here for more information.

Apply for an extension of the partial building permit for the construction of a plant

You can apply for the extension of your partial building permit. Click here for more information.

Apply for an extension of the partial building permit for the modification of a plant

You can apply for the extension of your partial building permit for the modification of installations. Click here for more information.

Apply for approval in simplified procedure for a plant according to BImSchG

If you submit an application under the simplified procedure for the approval of installations, you can obtain a permit for the construction and/or operation for installations of...

Apply for approval of the design for devices containing radioactive substances and installations for the production of ionising radiation

If you want to manufacture devices containing radioactive substances or equipment for the production of ionizing radiation that may be operated without a permit or notification,...

Apply for approval of the premature construction of a plant requiring a permit

In a procedure for granting a permit for facilities requiring a permit, you can submit an application to the competent authority for the early start of construction of a facility.

Apply for certification for companies for the climate-friendly installation, maintenance and servicing of plants

Your company wants to install, maintain, maintain, repair or decommission plants with fluorinated greenhouse gases, as well as check for tightness or recover the gases? Then you...

Apply for partial approval for the construction of a plant

If you wish to construct and/or operate part of a new facility, you must apply for a partial permit from the appropriate authority.

Apply for the construction and operation of plants

The construction and operation of plants require an immission control permit if they are likely to cause particular damage to the environment or endanger the general public.

Apply for the construction of a sewage treatment plant

Depending on the size and type of plant, you may also need a plant permit for the construction of a wastewater plant, in addition to the water discharge permit or indirect...

Applying for a building permit for the modification of a plant

Before you are allowed to modify a plant that requires a permit, you need a building permit. To do this, submit a building application to the responsible lower building...

Applying for a permit for a cremation facility

For the approval of a cremation facility (crematorium) you need a construction and an operating permit.

Applying for a permit for an accident-relevant modification of a plant requiring a permit

If you intend to make changes to an installation requiring a permit that are relevant to an incident, you must first apply to the responsible authority for a permit.

Applying for an extension of the building permit for the change of use of a plant

If you have a valid building permit for the change of use of a facility, you can apply for an extension.

Applying for an extension of the building permit for the construction of a plant

If you have a valid building permit for the construction of a facility, you can apply for an extension.

Applying for an extension of the building permit for the modification of a plant

If you have a valid building permit for the modification of a plant, you can apply for an extension.

Applying for testing of fuels from plants requiring a permit

The competent authority shall verify compliance with chemical, physical parameters and limit values for fuels. The results are reported annually to the Federal Environment...

Continuous measurement of plants for the biological treatment of waste

Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...

Display a plant that requires approval for the first time due to a change in the law

If you are constructing or have erected a plant requiring a permit and this installation has not yet been approved or notified, you must report this to the competent authority...

Display fuel oil consumer plant

If you want to install a new or significantly change a heating oil consumer system or emergency power system, this may be subject to notification. Please find out here what you...

Display incidents due to erection or changes in operating areas

Before the start of the construction of an operating area or if your operating area is to be changed in a relevant manner, you must notify the competent authority in advance.

Display the construction and operation of a plant that does not require a permit or a modification relevant to an accident

If you are planning an accident-relevant construction and operation or a modification of the installation relevant to an operation that does not require a permit and which is an...

Display the use of organic solvents in plants that do not require approval

Do you handle organic solvents in your company? Then you may have to report the system to the competent authority.

Genetic engineering plants Construction and operation Applying for a permit

The construction and operation, the substantial modification of genetic engineering plants of safety level 1 to 4 as well as further genetic engineering work of safety levels 2...

Have the operation of an interference source or a significant change in operation approved

If you intend to put an emitter into operation or make significant changes to its operation, this must be approved by the competent authority.

Immission control: Order plant inspection by experts

As part of the monitoring of industrial and commercial enterprises, the supervisory authorities may order measurements of emissions and immissions and safety-related tests by...

Indicate commissioning of installations for the storage or transfer of petrol, fuel mixtures or raw petrol

Do you operate a plant where fuels are stored and transferred? Then you have to report them to the authority.

Indicate construction or substantial modification or decommissioning of a liquid manure, slurry and silage leachate plant.

Do you want to build, substantially change or shut down a liquid manure, slurry or silage leachate plant or a plant for storing solid manure or silage? Then you may have to...

Indicate the operation or significant modification of a technical X-ray facility

If you intend to operate or significantly modify a technical X-ray facility and it does not require a permit, you are obliged to report this to the competent authority.

Notify the termination of the approved or notified operation or handling

You must inform the competent authority that you no longer wish to operate an X-ray facility.

Provide measurements on emissions from large combustion, gas turbine and combustion engine plants

The results of the continuous measurements must be submitted annually to the competent authorities for review.

Report exceedance of the measure values or disruption of the operation of evaporation, cooling systems and wet cutters

Exceeding the measure values for the concentration of Legionella in industrial water must be reported to the competent authority!

Request a review of the increased risk of incidents (domino effect)

In the case of neighbouring operating areas, the authority checks whether domino effects exist.

Request determination of final landfill closure

If you have taken all the necessary measures during the decommissioning phase of the landfill or the landfill section, you must apply to the competent authority for the final...

Request the establishment of an installation for the production, processing, processing or fission of nuclear fuels

Any person who establishes, operates or otherwise holds a fixed installation for the production or processing or processing of nuclear fuels or for the fission of irradiated...

Show change of a wastewater system

For the modification of a wastewater plant, you need a plant permit in addition to the change of the water discharge permit or indirect discharge permit. Both authorisations...

Show combustion plants

If you operate a medium combustion plant, you must notify it to the competent authority.

Show inspection, testing, maintenance and repair of X-ray equipment or interference sources

If you wish to check, test, maintain or repair X-ray equipment or interference sources on a commercial basis, you must notify the competent authority before starting the activity.

Show modification of a plant requiring a permit

If you want to make a change to an installation, you must notify the competent authority if a permit for the changes has not already been applied for.

Submit a maintenance concept for potentially explosive systems

As an employer, you can dispense with a recurring inspection of certain systems in potentially explosive atmospheres by developing a maintenance concept.

Submit a measurement report on air pollutant emissions

As an operator of a large combustion plant, gas turbine or internal combustion engine plant, you must submit measurement reports on air pollutant emissions at regular intervals...

Submit a safety report of plants requiring approval in accordance with the Hazardous Incident Ordinance

New or updated safety reports of upper class operating areas shall be submitted to the competent authority for review.

Submit individual measurements of plants for the biological treatment of waste

Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...

Submit information on the preparation of external alert and emergency response plans

Information, e.B. Dispersion considerations, necessary for the preparation of external emergency plans shall be submitted to the competent authority.

Substances hazardous to water: Specialist company - Proof of F. property

Upon request, specialist companies must prove the status of specialist company to the lower water authority in whose district they are active. It must also be possible to prove...

Transmit continuous measurement of cremation systems

Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...

Transmitting measurements of cremation systems

Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...

View commissioning of cremation systems

You want to run a crematorium? Then you must report the system to the responsible immission control authority before commissioning.

View commissioning of low-frequency systems

You want to operate a low-frequency system or a direct current system? Then you have to report them to the responsible immission control authority under certain conditions.

View evaporative cooling systems, cooling towers and wet separators

The commissioning of new evaporative cooling systems, cooling towers and wet separators is subject to notification, as well as changes and decommissioning of plants as well as...

View plant elimination

According to § 60 Abs.3 Bauordnung des Landes Sachsen-Anhalt (BauO LSA), the removal of Installations according to § 60 Abs. 1 BauO LSA, free-standing buildings of building...

View the operation or significant change in the operation of a dental, medical, and veterinary X-ray facility

If you intend to operate or substantially modify a dental, medical or veterinary X-ray facility and it is not subject to approval, you are obliged to report this to the...

View the removal of an attachment

If the disposal of your plant is not procedure-free, you must report the disposal.

Waste water: operation of plants - permit

Depending on the size and type of plant, you may also need a plant permit for the operation of a wastewater plant, in addition to the water discharge permit or indirect...