jump link

citizen service

Where?

You enter your place of residence or the place where you want to contact the administration or use the location sensing.

What?
play_arrow
Enter words here that describe what you are looking for (e.B. cut a tree) or a matter for citizens and companies (e.B. house construction, marriage).
There are 50 services for Facilities operations and inspections

Facilities operations and inspections

Facilities often have an impact on the environment – through noise, vibrations or emissions. That is why in many cases, operations require authorisations and are subject to regular inspections. You will find information and services here.

Services:

Apply for a building permit

You want to build a garage? Or your house is too small and needs an extension? In most cases, you need a building permit for this.

Apply for a partial building permit for the change of use of a plant

With the partial building permit, you can start construction work to change the use of construction phases before the building permit is issued.

Apply for a partial building permit for the construction of a plant

With the partial building permit, you can start construction work for the construction of construction phases before the building permit is issued. To do this, submit an...

Apply for a permit for petrol station

You want to operate a gas station? Then you must report this filling station to the responsible immission control authority before commissioning.

Apply for a permit to operate an X-ray facility or make a significant change to the operation of materials testing

If you operate an X-ray facility in technical radiography for coarse structure analysis in materials testing, or if you want to make changes to the operation, you are obliged to...

Apply for a permit to operate an X-ray facility or make a significant change to the operation of teleradiology

If you want to operate a teleradiological X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.

Apply for a permit to operate or substantially modify the operation of a technical X-ray facility

If you want to operate a technical X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.

Apply for approval of the design for devices containing radioactive substances and installations for the production of ionising radiation

If you want to manufacture devices containing radioactive substances or equipment for the production of ionizing radiation that may be operated without a permit or notification,...

Apply for certification for companies for the climate-friendly installation, maintenance and servicing of plants

Your company wants to install, maintain, maintain, repair or decommission plants with fluorinated greenhouse gases, as well as check for tightness or recover the gases? Then you...

Apply for the construction and operation of plants

The construction and operation of plants require an immission control permit if they are likely to cause particular damage to the environment or endanger the general public.

Apply for the construction of a sewage treatment plant

Depending on the size and type of plant, you may also need a plant permit for the construction of a wastewater plant, in addition to the water discharge permit or indirect...

Applying for a building permit in the simplified procedure

For some construction measures, a simplified building permit procedure according to § 62 Building Code of the State of Saxony-Anhalt (BauO LSA) must be carried out, for special...

Applying for a permit for a cremation facility

For the approval of a cremation facility (crematorium) you need a construction and an operating permit.

Applying for a permit for a substantial modification of an installation requiring approval

If you intend to make significant changes to an installation requiring approval, you must apply for a permit from the competent authority.

Applying for a permit for an accident-relevant modification of a plant requiring approval

If you intend to make accident-relevant changes to a plant requiring approval, you must first apply for a permit from the competent authority.

Applying for a permit to modify a plant for the production of electricity from renewable energies (repowering)

If you intend to make changes to an installation requiring a permit that generates electricity from renewable energies, you must apply for a permit from the competent authority.

Applying for testing of fuels from plants requiring a permit

The competent authority shall verify compliance with chemical, physical parameters and limit values for fuels. The results are reported annually to the Federal Environment...

Continuous measurement of plants for the biological treatment of waste

Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...

Display a change to an installation requiring approval

If you wish to make a modification to an installation, you must notify the competent authority if a permit for the changes has not already been applied for.

Display a plant that requires approval for the first time due to a change in the law

If you are constructing or have erected a plant requiring a permit and this installation has not yet been approved or notified, you must report this to the competent authority...

Display incidents due to erection or changes in operating areas

Before the start of the construction of an operating area or if your operating area is to be changed in a relevant manner, you must notify the competent authority in advance.

Display the use of organic solvents in plants that do not require approval

Do you handle organic solvents in your company? Then you may have to report the system to the competent authority.

Genetic engineering plants Construction and operation Applying for a permit

The construction and operation, the substantial modification of genetic engineering plants of safety level 1 to 4 as well as further genetic engineering work of safety levels 2...

Have the operation of an interference source or a significant change in operation approved

If you intend to put an emitter into operation or make significant changes to its operation, this must be approved by the competent authority.

Immission control: Order plant inspection by experts

As part of the monitoring of industrial and commercial enterprises, the supervisory authorities may order measurements of emissions and immissions and safety-related tests by...

Indicate commissioning of installations for the storage or transfer of petrol, fuel mixtures or raw petrol

Do you operate a plant where fuels are stored and transferred? Then you have to report them to the authority.

Indicate the operation or significant modification of a technical X-ray facility

If you intend to operate or significantly modify a technical X-ray facility and it does not require a permit, you are obliged to report this to the competent authority.

Provide measurements on emissions from large combustion, gas turbine and combustion engine plants

The results of the continuous measurements must be submitted annually to the competent authorities for review.

Report exceedance of the measure values or disruption of the operation of evaporation, cooling systems and wet cutters

Exceeding the measure values for the concentration of Legionella in industrial water must be reported to the competent authority!

Request a review of the increased risk of incidents (domino effect)

In the case of neighbouring operating areas, the authority checks whether domino effects exist.

Request determination of final landfill closure

If you have taken all the necessary measures during the decommissioning phase of the landfill or the landfill section, you must apply to the competent authority for the final...

Request the establishment of an installation for the production, processing, processing or fission of nuclear fuels

Any person who establishes, operates or otherwise holds a fixed installation for the production or processing or processing of nuclear fuels or for the fission of irradiated...

Show change of a wastewater system

For the modification of a wastewater plant, you need a plant permit in addition to the change of the water discharge permit or indirect discharge permit. Both authorisations...

Show combustion plants

If you operate a medium combustion plant, you must notify it to the competent authority.

Show inspection, testing, maintenance and repair of X-ray equipment or interference sources

If you wish to check, test, maintain or repair X-ray equipment or interference sources on a commercial basis, you must notify the competent authority before starting the activity.

Show operation of a heating oil system

If you decide to build and operate a heating oil system,a notification to the water authority of your county or city is required. The following should be displayed: the...

Submit a maintenance concept for potentially explosive systems

As an employer, you can dispense with a recurring inspection of certain systems in potentially explosive atmospheres by developing a maintenance concept.

Submit a measurement report on air pollutant emissions

As an operator of a large combustion plant, gas turbine or internal combustion engine plant, you must submit measurement reports on air pollutant emissions at regular intervals...

Submit a safety report of plants requiring approval in accordance with the Hazardous Incident Ordinance

New or updated safety reports of upper class operating areas shall be submitted to the competent authority for review.

Submit individual measurements of plants for the biological treatment of waste

Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...

Submit information on the preparation of external alert and emergency response plans

Information, e.B. Dispersion considerations, necessary for the preparation of external emergency plans shall be submitted to the competent authority.

Substances hazardous to water: Specialist company - Proof of F. property

Upon request, specialist companies must prove the status of specialist company to the lower water authority in whose district they are active. It must also be possible to prove...

Transmit continuous measurement of cremation systems

Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...

Transmitting measurements of cremation systems

Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...

View commissioning of cremation systems

You want to run a crematorium? Then you must report the system to the responsible immission control authority before commissioning.

View commissioning of low-frequency systems

You want to operate a low-frequency system or a direct current system? Then you have to report them to the responsible immission control authority under certain conditions.

View evaporative cooling systems, cooling towers and wet separators

The commissioning of new evaporative cooling systems, cooling towers and wet separators is subject to notification, as well as changes and decommissioning of plants as well as...

View plant elimination

According to § 60 Abs.3 Bauordnung des Landes Sachsen-Anhalt (BauO LSA), the removal of Installations according to § 60 Abs. 1 BauO LSA, free-standing buildings of building...

View the operation or significant change in the operation of a dental, medical, and veterinary X-ray facility

If you intend to operate or substantially modify a dental, medical or veterinary X-ray facility and it is not subject to approval, you are obliged to report this to the...

Waste water: operation of plants - permit

Depending on the size and type of plant, you may also need a plant permit for the operation of a wastewater plant, in addition to the water discharge permit or indirect...