You want to build a garage? Or your house is too small and needs an extension? In most cases, you need a building permit for this.
With the partial building permit, you can start construction work to change the use of construction phases before the building permit is issued.
With the partial building permit, you can start construction work for the construction of construction phases before the building permit is issued. To do this, submit an...
You want to operate a gas station? Then you must report this filling station to the responsible immission control authority before commissioning.
If you operate an X-ray facility in technical radiography for coarse structure analysis in materials testing, or if you want to make changes to the operation, you are obliged to...
If you want to operate a teleradiological X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.
If you want to operate a technical X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.
If you want to manufacture devices containing radioactive substances or equipment for the production of ionizing radiation that may be operated without a permit or notification,...
Your company wants to install, maintain, maintain, repair or decommission plants with fluorinated greenhouse gases, as well as check for tightness or recover the gases? Then you...
The construction and operation of plants require an immission control permit if they are likely to cause particular damage to the environment or endanger the general public.
Depending on the size and type of plant, you may also need a plant permit for the construction of a wastewater plant, in addition to the water discharge permit or indirect...
For some construction measures, a simplified building permit procedure according to § 62 Building Code of the State of Saxony-Anhalt (BauO LSA) must be carried out, for special...
For the approval of a cremation facility (crematorium) you need a construction and an operating permit.
If you intend to make significant changes to an installation requiring approval, you must apply for a permit from the competent authority.
If you intend to make accident-relevant changes to a plant requiring approval, you must first apply for a permit from the competent authority.
If you intend to make changes to an installation requiring a permit that generates electricity from renewable energies, you must apply for a permit from the competent authority.
The competent authority shall verify compliance with chemical, physical parameters and limit values for fuels. The results are reported annually to the Federal Environment...
Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...
If you wish to make a modification to an installation, you must notify the competent authority if a permit for the changes has not already been applied for.
If you are constructing or have erected a plant requiring a permit and this installation has not yet been approved or notified, you must report this to the competent authority...
Before the start of the construction of an operating area or if your operating area is to be changed in a relevant manner, you must notify the competent authority in advance.
Do you handle organic solvents in your company? Then you may have to report the system to the competent authority.
The construction and operation, the substantial modification of genetic engineering plants of safety level 1 to 4 as well as further genetic engineering work of safety levels 2...
If you intend to put an emitter into operation or make significant changes to its operation, this must be approved by the competent authority.
As part of the monitoring of industrial and commercial enterprises, the supervisory authorities may order measurements of emissions and immissions and safety-related tests by...
Do you operate a plant where fuels are stored and transferred? Then you have to report them to the authority.
If you intend to operate or significantly modify a technical X-ray facility and it does not require a permit, you are obliged to report this to the competent authority.
The results of the continuous measurements must be submitted annually to the competent authorities for review.
Exceeding the measure values for the concentration of Legionella in industrial water must be reported to the competent authority!
In the case of neighbouring operating areas, the authority checks whether domino effects exist.
If you have taken all the necessary measures during the decommissioning phase of the landfill or the landfill section, you must apply to the competent authority for the final...
Any person who establishes, operates or otherwise holds a fixed installation for the production or processing or processing of nuclear fuels or for the fission of irradiated...
For the modification of a wastewater plant, you need a plant permit in addition to the change of the water discharge permit or indirect discharge permit. Both authorisations...
If you operate a medium combustion plant, you must notify it to the competent authority.
If you wish to check, test, maintain or repair X-ray equipment or interference sources on a commercial basis, you must notify the competent authority before starting the activity.
If you decide to build and operate a heating oil system,a notification to the water authority of your county or city is required. The following should be displayed:
the...
As an employer, you can dispense with a recurring inspection of certain systems in potentially explosive atmospheres by developing a maintenance concept.
As an operator of a large combustion plant, gas turbine or internal combustion engine plant, you must submit measurement reports on air pollutant emissions at regular intervals...
New or updated safety reports of upper class operating areas shall be submitted to the competent authority for review.
Do you operate a plant for the biological treatment of waste? Then you have to determine the air pollutant emissions from the plant and submit the measurement results to the...
Information, e.B. Dispersion considerations, necessary for the preparation of external emergency plans shall be submitted to the competent authority.
Upon request, specialist companies must prove the status of specialist company to the lower water authority in whose district they are active. It must also be possible to prove...
Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...
Do you run a crematorium? Then you have to have the air pollutant emissions from the plant checked and submit the measurement results to the responsible immission control...
You want to run a crematorium? Then you must report the system to the responsible immission control authority before commissioning.
You want to operate a low-frequency system or a direct current system? Then you have to report them to the responsible immission control authority under certain conditions.
The commissioning of new evaporative cooling systems, cooling towers and wet separators is subject to notification, as well as changes and decommissioning of plants as well as...
According to § 60 Abs.3 Bauordnung des Landes Sachsen-Anhalt (BauO LSA), the removal of
Installations according to § 60 Abs. 1 BauO LSA,
free-standing buildings of building...
If you intend to operate or substantially modify a dental, medical or veterinary X-ray facility and it is not subject to approval, you are obliged to report this to the...
Depending on the size and type of plant, you may also need a plant permit for the operation of a wastewater plant, in addition to the water discharge permit or indirect...