Facilities often have an impact on the environment – through noise,
vibrations or emissions. That is why in many cases, operations require authorisations
and are subject to regular inspections. You will find information and services
here.
If you wish to manufacture devices containing radioactive substances or installations for the generation of ionising radiation which may be operated without a licence or notification, you may apply for a type approval.
With the partial building permit, you can start construction work to change construction phases before the building permit. To do this, submit an application for a partial building permit to the responsible lower building supervisory authority.
If you wish to construct and operate or modify an installation that does not require a permit and that is an operating area or part of an operating area and this may result in accident-related effects, you must apply for a permit.
If you intend to make changes to an installation that requires a permit and generates electricity from renewable energy sources, you must apply for a permit from the relevant authority.
If you want to set up and operate a plant that could damage the environment or endanger the general public, you need a permit under immission control law.
If you want to market eggs from your laying hen farm, you may have to register it.
Upon registration, your farm will be assigned an identification number.
Do you want to operate an X-ray system in technical radiography for coarse structure analysis in materials testing or make changes to the operation? Then you must notify the competent authority for radiation protection and apply for a permit.
If you wish to operate a teleradiology X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.
Are you applying for a permit for installations under the simplified procedure? Then you can obtain a permit from the competent authority for the construction and operation of installations of a certain type or scope without public participation.
In a procedure for granting a permit for facilities requiring a permit, you can submit an application to the competent authority for the early start of construction of a facility.
If you, as the manufacturer, have made technical changes to a terminal device that is already certified for digital radio for authorities and organizations with security tasks, compliance with the legal requirements must be checked again.
Depending on the size and type of system, you may need a system permit in addition to the water discharge permit or indirect discharge permit (into the public sewer system) for...
With partial building permission, you can start construction work on building sections before planning permission is granted. To do this, you submit an application for partial building permission.
If you intend to make changes to an installation requiring a permit that are relevant to an incident, you must first apply to the responsible authority for a permit.
If you wish to operate technical X-ray equipment or make significant changes to it, you must first apply for a permit from the responsible radiation protection authority.
If you want to change the use of a facility that requires a permit, you need a change of use permit (building permit) beforehand. You must apply for this.
You need planning permission before you can make changes to a building that requires approval. To do this, you submit a building application to the responsible lower building supervisory authority.
The competent authority shall verify compliance with chemical, physical parameters and limit values for fuels. The results are reported annually to the Federal Environment Agency, which in turn reports them to the European Commission (National Fuel Report).
The Federal Network Agency regularly analyzes developments on the rail market. The aim is to identify potential for discrimination and strengthen competition. The data and its analyses are published in the "Rail Market Survey".
If you are constructing or have erected a plant requiring a permit and this installation has not yet been approved or notified, you must report this to the competent authority in due time.
If you put publicly accessible normal and fast charging points into or out of operation, you must notify the Federal Network Agency. You must also notify the Federal Network Agency if you make private charging points public or transfer your charging points to another operator.
If you operate a mobile X-ray unit in connection with an application on animals in veterinary medicine or if this approved activity changes significantly, you are obliged to notify the competent authority in order to obtain a permit.
If you intend to operate or significantly modify a dental, medical or veterinary X-ray facility and this is not subject to approval, you are obliged to notify the competent authority.
If you intend to operate or significantly modify a dental, medical or veterinary X-ray facility and this is not subject to approval, you are obliged to notify the competent authority.
If you are planning an accident-relevant construction and operation or a modification of the installation relevant to an operation that does not require a permit and which is an operating area or part of an operating area, you must notify this.
To modify a wastewater treatment plant, you need a plant permit in addition to the modification of the water discharge permit or indirect discharger permit. Both permits should b...
The construction and operation, the substantial modification of genetic engineering plants of safety level 1 to 4 as well as further genetic engineering work of safety levels 2 to 4 require the notification/registration confirmation or the approval of the responsible genetic engineering authority.
You may only treat seed with certain crop protection products if your dressing station produces seed that releases as little dust as possible. If you operate a seed dressing site, you are required to have your process technology, procedures and documentation audited.
If you take over a system for handling substances hazardous to water in order to operate it, this change of operator must be reported to the responsible lower water authority.
If you intend to put an interference emitter into operation or make significant changes to its operation, this must be approved by the responsible authority.
If you want to set the clock of your computer or your mobile device exactly, you can use a service of the Physikalisch-Technische Bundesanstalt (PTB) which enables time...
You must immediately report changes to a terminal device already certified for BOS digital radio to the Federal Agency for the Digital Radio of Authorities and Organizations with Security Tasks (BDBOS).
If you intend to operate or significantly modify a technical X-ray device and this is not subject to approval, you are obliged to notify the competent authority.
If you have taken all the necessary measures during the decommissioning phase of the landfill or the landfill section, you must apply to the competent authority for the final decommissioning to be established.
Any person who establishes, operates or otherwise holds a fixed installation for the production or processing or processing of nuclear fuels or for the fission of irradiated...
Construction measures that affect the road must be secured by traffic signs.
If construction work or other uses require the use of roads and ancillary facilities, such as...
If you wish to check, test, maintain or repair X-ray equipment or interference sources on a commercial basis, you must notify the competent authority before starting the activity.
As an employer, you can eliminate the need for recurring inspections of certain systems in potentially explosive atmospheres by drawing up a maintenance concept.
If you operate a plant for the biological treatment of waste, you must have the air pollutant emissions checked regularly by means of individual measurements.
Upon request, specialist companies must prove the status of specialist company to the lower water authority in whose district they are active. It must also be possible to prove...
The commissioning of new evaporative cooling systems, cooling towers and wet separators is subject to notification, as well as changes and decommissioning of plants as well as changes of operator.
According to § 60 Abs.3 Bauordnung des Landes Sachsen-Anhalt (BauO LSA), the removal of
Installations according to § 60 Abs. 1 BauO LSA,
free-standing buildings of building...
Depending on the size and type of system, you may require a system permit in addition to the water discharge permit or indirect discharge permit (into the public sewer system) fo...