There are 68 services for Facilities operations and inspections

Facilities operations and inspections

Facilities often have an impact on the environment – through noise, vibrations or emissions. That is why in many cases, operations require authorisations and are subject to regular inspections. You will find information and services here.

Services:

Application for type approval for devices containing radioactive substances and installations for the generation of ionising radiation

If you wish to manufacture devices containing radioactive substances or installations for the generation of ionising radiation which may be operated without a licence or notification, you may apply for a type approval.

Apply for a partial building permit for the modification of a plant

With the partial building permit, you can start construction work to change construction phases before the building permit. To do this, submit an application for a partial building permit to the responsible lower building supervisory authority.

Apply for a permit for the construction and operation or modification of an installation that does not require a permit

If you wish to construct and operate or modify an installation that does not require a permit and that is an operating area or part of an operating area and this may result in accident-related effects, you must apply for a permit.

Apply for a permit to modify an installation for the generation of electricity from renewable energy sources (repowering).

If you intend to make changes to an installation that requires a permit and generates electricity from renewable energy sources, you must apply for a permit from the relevant authority.

Apply for a preliminary decision on a plant requiring a permit

If you apply for a preliminary decision on a plant requiring a permit, the competent authority may grant this under certain conditions.

Apply for an extension of the partial building permit for the change of use of a plant

You can apply for the extension of your partial building permit for the change of use of facilities. Click here for more information.

Apply for an extension of the partial building permit for the construction of a plant

You can apply for the extension of your partial building permit. Click here for more information.

Apply for an extension of the partial building permit for the modification of a plant

You can apply for the extension of your partial building permit for the modification of installations. Click here for more information.

Apply for an identification number for farms that keep laying hens to identify eggs

If you want to market eggs from your laying hen farm, you may have to register it.
Upon registration, your farm will be assigned an identification number.

Apply for approval for the operation of an X-ray facility or the significant modification of the facility for materials testing

Do you want to operate an X-ray system in technical radiography for coarse structure analysis in materials testing or make changes to the operation? Then you must notify the competent authority for radiation protection and apply for a permit.

Apply for approval for the operation of an X-ray facility or the significant modification of the operation for teleradiology

If you wish to operate a teleradiology X-ray facility or make significant changes to it, you must first apply for a permit from the competent authority.

Apply for approval in the simplified procedure for an installation in accordance with the BImSchG

If you submit an application under the simplified procedure for the approval of installations, you can obtain a permit for the construction and/or operation of installations of a certain type or scope from the competent authority without public participation.

Apply for approval of the premature construction of a plant requiring a permit

In a procedure for granting a permit for facilities requiring a permit, you can submit an application to the competent authority for the early start of construction of a facility.

Apply for modification certification of terminals for BOS digital radio

If you, as the manufacturer, have made technical changes to a terminal device that is already certified for digital radio for authorities and organizations with security tasks, compliance with the legal requirements must be checked again.

Apply for partial approval for the construction of a plant

If you wish to construct and/or operate part of a new facility, you must apply for a partial permit from the appropriate authority.

Apply for the construction and operation of plants

The construction and operation of plants require an immission control permit if they are likely to cause particular damage to the environment or endanger the general public.

Apply for the construction of a sewage system

Depending on the size and type of system, you may need a system permit in addition to the water discharge permit or indirect discharge permit (into the public sewer system) for...

Applying for a partial building permit for the construction of a system

With partial building permission, you can start construction work on building sections before planning permission is granted. To do this, you submit an application for partial building permission.

Applying for a permit for an accident-relevant modification of a plant requiring a permit

If you intend to make changes to an installation requiring a permit that are relevant to an incident, you must first apply to the responsible authority for a permit.

Applying for an extension of the building permit for the change of use of a facility

If you have a valid building permit for the change of use of a facility, you can apply for an extension.

Applying for an extension of the building permit for the construction of an installation

If you have a valid building permit for the construction of an installation, you can apply for an extension.

Applying for an extension of the building permit for the modification of an installation

If you have a valid building permit for the modification of an installation, you can apply for an extension.

Applying for approval for a significant change to an installation requiring approval

If you intend to make significant changes to an installation that requires a permit, you must apply for a permit from the responsible authority.

Applying for approval to operate or significantly change the operation of a technical X-ray facility

If you wish to operate technical X-ray equipment or make significant changes to it, you must first apply for a permit from the responsible radiation protection authority.

Applying for partial planning permission for the change of use of a facility

With the partial building permit, you can start construction work on the change of use of building sections before the building permit is granted.

Applying for planning permission for the change of use of a facility

If you want to change the use of a facility that requires a permit, you need a change of use permit (building permit) beforehand. You must apply for this.

Applying for planning permission for the change of use of a facility using the simplified procedure

You need a permit before you can change the use of an installation that requires a permit.

Applying for planning permission for the modification of an installation

You need planning permission before you can make changes to a building that requires approval. To do this, you submit a building application to the responsible lower building supervisory authority.

Applying for planning permission for the modification of an installation using the simplified procedure

You need planning permission before you can make changes to a system that requires approval.

Applying for planning permission to erect a plant using the simplified procedure

You need a building permit before you can erect an installation that requires approval.

Applying for planning permission to erect a system

If you want to build an installation that requires approval, you will need a building permit. You must submit a building application for this.

Applying for testing of fuels from plants requiring a permit

The competent authority shall verify compliance with chemical, physical parameters and limit values for fuels. The results are reported annually to the Federal Environment Agency, which in turn reports them to the European Commission (National Fuel Report).

Create report market investigation railroad

The Federal Network Agency regularly analyzes developments on the rail market. The aim is to identify potential for discrimination and strengthen competition. The data and its analyses are published in the "Rail Market Survey".

Display a plant that requires approval for the first time due to a change in the law

If you are constructing or have erected a plant requiring a permit and this installation has not yet been approved or notified, you must report this to the competent authority in due time.

Display installation and decommissioning of publicly accessible charging points

If you put publicly accessible normal and fast charging points into or out of operation, you must notify the Federal Network Agency. You must also notify the Federal Network Agency if you make private charging points public or transfer your charging points to another operator.

Display operation of an X-ray device or significant change in operation

If you operate a mobile X-ray unit in connection with an application on animals in veterinary medicine or if this approved activity changes significantly, you are obliged to notify the competent authority in order to obtain a permit.

Display operation or significant change in operation of dental, medical and veterinary X-ray equipment

If you intend to operate or significantly modify a dental, medical or veterinary X-ray facility and this is not subject to approval, you are obliged to notify the competent authority.

Display operation or significant change in operation of dental, medical and veterinary X-ray equipment

If you intend to operate or significantly modify a dental, medical or veterinary X-ray facility and this is not subject to approval, you are obliged to notify the competent authority.

Display the construction and operation of a plant that does not require a permit or a modification relevant to an accident

If you are planning an accident-relevant construction and operation or a modification of the installation relevant to an operation that does not require a permit and which is an operating area or part of an operating area, you must notify this.

Displaying changes to a wastewater system

To modify a wastewater treatment plant, you need a plant permit in addition to the modification of the water discharge permit or indirect discharger permit. Both permits should b...

Genetic engineering plants Construction and operation Applying for a permit

The construction and operation, the substantial modification of genetic engineering plants of safety level 1 to 4 as well as further genetic engineering work of safety levels 2 to 4 require the notification/registration confirmation or the approval of the responsible genetic engineering authority.

Having terminals certified for BOS digital radio

If you manufacture or sell terminals for BOS digital radio, you must have them certified.

Information on the creation of external alarm and emergency plans Communication

Information, e.g. dispersion considerations, required for the preparation of external emergency plans must be submitted to the competent authority.

List of "Seed treatment facilities with quality assurance systems for dust reduction": apply for inclusion of a seed treatment facility

You may only treat seed with certain crop protection products if your dressing station produces seed that releases as little dust as possible. If you operate a seed dressing site, you are required to have your process technology, procedures and documentation audited.

Notify change of operator of a system for handling substances hazardous to water (AwSV system, except heating oil consumer system)

If you take over a system for handling substances hazardous to water in order to operate it, this change of operator must be reported to the responsible lower water authority.

Notify the termination of the approved or notified operation or handling

You must inform the competent authority that you no longer wish to operate an X-ray facility.

Obtain approval for the operation of an interference emitter or a significant change in operation

If you intend to put an interference emitter into operation or make significant changes to its operation, this must be approved by the responsible authority.

Perform time synchronization of computers

If you want to set the clock of your computer or your mobile device exactly, you can use a service of the Physikalisch-Technische Bundesanstalt (PTB) which enables time...

Report exceedance of the measure values or disruption of the operation of evaporation, cooling systems and wet cutters

Exceeding the measure values for the concentration of Legionella in industrial water must be reported to the competent authority!

Report insignificant changes to a terminal device for BOS digital radio

You must immediately report changes to a terminal device already certified for BOS digital radio to the Federal Agency for the Digital Radio of Authorities and Organizations with Security Tasks (BDBOS).

Report the operation or significant modification of technical X-ray equipment

If you intend to operate or significantly modify a technical X-ray device and this is not subject to approval, you are obliged to notify the competent authority.

Request a review of the increased risk of incidents (domino effect)

In the case of neighbouring operating areas, the authority checks whether domino effects exist.

Request determination of final landfill closure

If you have taken all the necessary measures during the decommissioning phase of the landfill or the landfill section, you must apply to the competent authority for the final decommissioning to be established.

Request the establishment of an installation for the production, processing, processing or fission of nuclear fuels

Any person who establishes, operates or otherwise holds a fixed installation for the production or processing or processing of nuclear fuels or for the fission of irradiated...

Set up construction site

Construction measures that affect the road must be secured by traffic signs. If construction work or other uses require the use of roads and ancillary facilities, such as...

Show inspection, testing, maintenance and repair of X-ray equipment or interference sources

If you wish to check, test, maintain or repair X-ray equipment or interference sources on a commercial basis, you must notify the competent authority before starting the activity.

Show modification of an installation requiring approval

If you wish to make a change to an installation, you must notify the competent authority if a permit for the changes has not already been applied for.

Show removal of an installation

If the removal of your system is not exempt from procedures, you must notify the authorities of the removal.

Submit maintenance concept for potentially explosive systems

As an employer, you can eliminate the need for recurring inspections of certain systems in potentially explosive atmospheres by drawing up a maintenance concept.

Submit measurement report on individual measurements of air pollutants at plants for the biological treatment of waste

If you operate a plant for the biological treatment of waste, you must have the air pollutant emissions checked regularly by means of individual measurements.

Substances hazardous to water: Specialist company - Proof of F. property

Upon request, specialist companies must prove the status of specialist company to the lower water authority in whose district they are active. It must also be possible to prove...

View evaporative cooling systems, cooling towers and wet separators

The commissioning of new evaporative cooling systems, cooling towers and wet separators is subject to notification, as well as changes and decommissioning of plants as well as changes of operator.

View plant elimination

According to § 60 Abs.3 Bauordnung des Landes Sachsen-Anhalt (BauO LSA), the removal of Installations according to § 60 Abs. 1 BauO LSA, free-standing buildings of building...

Waste water: Operation of plants - Approval

Depending on the size and type of system, you may require a system permit in addition to the water discharge permit or indirect discharge permit (into the public sewer system) fo...